CMMC Level 2 for a Satellite Communications Integrator

Every practice met at the C3PAO assessment, with no POA&M items carried forward.

Client name withheld by agreement
Client
Satellite communications systems integrator
Region
Huntsville, Alabama
Year
2025
Duration
18 weeks
Scope
110 NIST SP 800-171 practices · 2 labs · 140 cleared users
Practice
AI, Cloud & Digital Trust

The challenge

What was at stake.

A satellite communications integrator builds ground terminals and network management software for defense programs. Controlled unclassified information moved between two engineering labs, a software build farm and subcontractors by email and shared drives.

A new prime contract required CMMC Level 2 certification before award. The integrator had a system security plan written three years earlier for a network that no longer existed.

What we did

The approach, step by step.

  1. 01

    Boundary drawn around the work

    We followed CUI from contract receipt through design, build and delivery, then set an assessment boundary that kept business systems out.

  2. 02

    Labs and build farm hardened

    Configuration baselines, application allowlisting, audit logging and FIPS-validated encryption were applied to lab workstations and build servers.

  3. 03

    Subcontractor sharing controlled

    A managed file exchange with access expiry replaced email for CUI going to and from eleven subcontractors.

  4. 04

    SSP rewritten from the ground truth

    A new system security plan and evidence set described every practice exactly as it now operates, with screenshots and owners.

  5. 05

    Assessment rehearsed

    A mock assessment against every objective, including staff interviews, gave the team confidence before the C3PAO arrived.

Outcomes

What changed, in numbers.

110
of 110 practices met at assessment
0
POA&M items carried forward
11
subcontractors moved to controlled file exchange
18
weeks from kickoff to assessment ready
The assessor asked to see a control and our engineer pulled it up in seconds. That happened all week.
Vice President, Programs, client name withheld